SKIP TO CONTENT

Managing surface water is a planning requirement on most new developments. We design and install attenuation tanks that control the rate water enters the drainage network, helping developments meet SuDS and local authority requirements.

We predominantly cover Wales and the border counties (Cheshire, Shropshire & Herefordshire), but will travel further afield where required.

GET A QUOTE NOW

WHAT IS AN ATTENUATION TANK?

An attenuation tank is an underground storage system that holds surface water runoff during heavy rainfall and releases it back into the drainage network at a controlled rate, rather than letting it all discharge at once. It’s a core part of Sustainable Drainage Systems (SuDS), and is typically required as a planning condition on new developments to prevent the extra hard surfacing from overwhelming local sewers and watercourses.

Tanks are usually built from modular geocellular crates or large-diameter pipework, sized to match the site’s runoff and the discharge rate set by the local authority or water company.

WHY YOU NEED ONE

  • Planning compliance – Most local authorities require SuDS as a condition of approval for new developments, and attenuation is a key part of meeting it.
  • Flood risk management – Controls the rate water enters the network, reducing the risk of the site, or the surrounding area, flooding during heavy rainfall.
  • Site flexibility – Underground storage means no land is lost to surface attenuation ponds, which matters on tighter urban or infill sites.
  • Future-proofing – Sized correctly, a tank helps a development handle increasingly heavy rainfall events without needing retrofitting later.

OUR PROCESS

  1. Site Assessment – We look at the site layout, ground conditions, existing services and the discharge rate set by the local authority or water company.
  2. Design – We size and specify the tank to match the site’s runoff and required discharge rate, working to Building Regulations Part H and local SuDS/LLFA requirements.
  3. Installation – Excavation and installation of the tank, inlet/outlet pipework and flow control chamber, working around existing services and site constraints.
  4. Connection & Testing – Connection to the wider drainage network, with testing to confirm the system performs as designed.
  5. Handover – As-built documentation provided to support planning sign-off, adoption or Building Control approval as required.

NEW BUILDS & DEVELOPMENTS

This is predominantly a new-build and development service. We work with property developers, main contractors and self-builders to get attenuation right from the design stage, either as a standalone package or as part of a wider turnkey groundworks and drainage solution. Getting the tank sized and positioned correctly early avoids costly redesign or delays further into the build programme.

WHY CHOOSE SMIP

  • Turnkey capability – Attenuation tank installation as a standalone package, or as part of a wider groundworks, earthworks or construction solution — one point of contact instead of several contractors.
  • Regulation-compliant – Designed and installed to Building Regulations Part H and local SuDS/LLFA requirements.
  • Fully insured – Covered for all work types we carry out.
  • Local coverage – Based on the Wales/England border, covering Wales, Cheshire, Shropshire & Herefordshire as standard, with further travel where required.

ATTENUATION TANK FAQs

Do I need an attenuation tank for my development?

 Most new developments with additional hard surfacing need some form of SuDS, and attenuation is often part of that. Requirements vary by local authority. We can advise based on your specific site and planning conditions.

How is an attenuation tank sized?

Sizing depends on the site’s expected runoff volume and the discharge rate set by the local authority or water company, alongside ground conditions and site layout constraints.

Can attenuation tanks go under a car park or driveway?

Yes, modular systems can be specified to handle trafficked loads, so tanks can sit beneath parking areas, driveways or access roads without taking up additional land.

Do you handle the planning and approval side too?

We can provide as-built documentation and technical detail to support your planning submission or Building Control approval, working alongside your design team where one’s already involved.

What areas do you cover?

We predominantly cover Wales and the border counties, and will travel further afield where required.

PLANNING A DEVELOPMENT AND NEED SuDS-COMPLIANT DRAINAGE?

Get in touch to discuss attenuation tank design and installation.

Call the office team
01938 578888

DROP US A MESSAGE